Track Record Dispute Management A Knowledge-Based Project Management Approach
Daniel Atkinson has developed and adopted the "Management Plan" approach based on project
management principles. Details of this Management Approach are given
at Dispute
Management Services.
An essential part of Dispute Management on any dispute is the management
of documents. Daniel Atkinson has successfully adopted different document management systems on different
disputes, each chosen to meet the demands of the evidence available and the
resolution forum. The approach, together with details of Electronic Data Management Systems
("EDMS") is given at Dispute
Management Services.

The approach taken to management of witnesses, technical experts, lawyers
and the use of diagnostic analysis using formulae driven computerised
analysis, and critical path network analysis is given at Dispute
Management Services.
An example of a diagnostic approach is given
here, which is one of a series of charts generated by computer
automatically from spreadsheet data and specially written formulae.
the charts were part of a presentation show for each piling area
demonstrated on computer monitor.
The data was easily transferrable to cd-rom or other electronic media.
Daniel Atkinson has experience of Dispute Management for a breadth of
disputes in different industries and under different legal systems each with
different management problems. The following are a selection to
demonstrate the breadth of experience:
- Dispute Manager of a team of professionals examining the causes of failure of a
cofferdam in UK, examining the analysis prepared by Geotechnical experts and
directing further analysis. This consisted of interviewing site engineers to
establish sequence of events and advising Directors of potential liability.
Led negotiations as advocate which culminated in a successful settlement.
- Dispute Manager
directing a team of professionals on the preparation of a claim
on an international dispute relating to the manufacture of two tunnel boring
machines. This involved the interview of engineers in Germany and the Far
East and an understanding of the manufacture process and the ground
conditions encountered. Acted as a liaison with the French advocate leading
to a successful settlement.
- Dispute Manager of a
team of professionals with a further client engineers on the
preparation of an international dispute involving foreign law on
a contract for the design and manufacture of mechanical electrical and
electronic tunnelling equipment, including an EPB TBM.
The preparation involved understanding the technical nature of designing and
manufacturing tunnel boring machines and the operation of the clients
business, the operation of the machines at site and the ground conditions
encountered. Prepared claim submission for variations and delays and
defended a counterclaim from the contracting consortium. As English
advocate, assisted foreign advocate in the preparation of the Statement of
Case for the arbitration in Denmark and assisted the Scots advocates in the
court action. Advised on actions under European Law. Prevented bonds being drawn by the consortium, and led the negotiations as advocate in
Switzerland and Denmark which culminated in a successful settlement to the
dispute.
- Advocate and Dispute Manager with
conduct of the international case directing a team of professionals on
the preparation of a professional negligence claim for an
Far Eastern Contractor on design and advice by a US Consultant in relation
to a post-tensioned segmental box girder bridge of varying profile
constructed on piles and located on the Indian continent. Directing experts,
instructing Counsel both in the UK and in the USA and on the Indian
continent and under ICC Arbitration rules. It also involved giving advice on
insurance policies and Letters of Credit. Settled successfully.
- Dispute Manager of a
team of professionals on the preparation of a claim for
piling works to a railway bridge. This involved directing the analysis of
the pile design and site investigation to establish a claim of impossibility and unforeseen ground conditions. Assisted the Scottish advocate on the preparation of Statement of
Case and subsequently in arbitration.
- Preparation
of a claim under a sub-contract for piling works,
using spreadsheet diagnostic technology based on piling records. Directed
sub-contractor’s piling experts on the analysis required and examination
of the resultant analysis of ultimate load capacity and founding levels for
the specified working loads, including directing analysis to be carried out.
Subsequently prepared opinions on ensuing steps in disputes resolution,
which led to a successful settlement.
- Advocate and
conduct of the case on the defence in an international arbitration on a road
project in Belarus Leading a team of professionals and preparing
Instructions for Counsel in an ICC Arbitration with the seat of arbitration
in France. Headed negotiations as advocate which led to a successful
settlement.
- Dispute manager and Advocate on disputes under term contracts for repair
of roads including adjudication and settlement negotiations.
- Dispute Manager and Advocate on a dispute on the refurbishment of a
hospital including mediation, adjudication and arbitration leading to
settlement.
- Managed the conduct of the defence in arbitration on a shopping centre for a development corporation concerning a design
and construction form of contract. Secured a successful settlement for
the client before hearing.
- Conduct of a UK case relating to a dispute on the construction of an Hospital
involving analysis of delay and disruption using the comparative norm method and
acting as advocate in negotiations.
- Directed a team of professionals on a dispute involving a major
development on a management form of contract with a national management
contractor. The preparation of extension of time claims allowed the
contractor to receive a substantial award in the subsequent
arbitration.
- Directed the investigation of the potential liability of an Employer on a large power station.
Dispute Manager of a team of professionals
on the preparation of the technical and legal analysis of issues,
preparation of the as-built programme and advise on settlement levels. In
addition, personally investigated piling issues involving the analysis of
site investigation reports, consulting engineer reports and two expert
reports prepared in anticipation of litigation and the examination of piling
records to establish whether preboring was required. Advised Managing
Director and in-house lawyers directly of potential liability. Subsequently
advised the Engineer under the contract on dealing with contractor claims
and advised on contractual,
technical and procedural matters.
- Dispute Manager of a a team of professionals on the preparation of a claim on the
design and construction of a pharmaceuticals process plant, involving an
understanding of the process, the difficulties of construction and the
design process. Advised on strategies to be adopted and prepared
Instructions for Counsel and led negotiations to successful settlement.
- Advocate and
conduct of the case in an international engineering dispute, directing a
team of four professionals in Germany in the preparation of a claim relating to the construction of LNG Tanks constructed in rock and
designed to function after seismic loadings and involving foreign law. The
preparation of the claim involved understanding the principles of seismic
design and assisting the designers in preparing analysis to explain the
development of the LNG Tanks, interviewing of engineers in Greece to record
the progress of the construction works and working in liaison with the
foreign advocate in the preparation of Statement of Case and advising on
strategies.
- The defence
of a claim on a large petro-chemical plant, including the analysis of the
large volume of test-pack information using spreadsheets design
specifically. Set up and managed the system for database tracking of
correspondence. Prepared analysis of legal issues related to quantum of
damages for settled claims. This approach allowed the true value of the
claim to be quickly evaluated and led to a successful settlement.
- Prepared a claim for a world leading electronics company for a radio system in
an international tunnel contract involving foreign law. The dispute required
technical understanding of the function of the radio systems as well as the
design, manufacture and installations processes involved. Led negotiations
as advocate which culminated in a successful settlement.
|